In 2008 the plan was been developed through a working group made up of representatives from Hobart, Clarence, Glenorchy, Kingborough and Brighton Councils as well as a representative from the Department of Infrastructure, Energy and Resources. A funding grant was provided by the Department of the Environment, Water, Heritage and the Arts to assist with the development of the plan. CyclingSouth prepared the document with reference to the municipal bicycle plans of each Council and in consultation with the working group. Public consultation was carried out in 2008 and feedback was collated and incorporated into the final document - Hobart Regional Arterial Bicycle Network 2009.
http://www.cyclingsouth.org/images/stories/Documents/final-cyclingsouth2010.pdf